Feb. 21 (7 hrs, I had 4 elementary school
groups visit)
Feb. 19 (8 hours, beautiful weather)
Feb. 17 (4 hours)
Feb. 14 (2 hours in the rain)
Feb. 12 (3 hours)
Feb. 11 (3 hours)
Feb. 8 (3 hours)
Feb. 7 (0 hours)
Feb. 6, 2001
The Stone is in place!
The base is poured, the pin is in the
right place and the stone SHOULD be placed in a day or two.
Artist Bill Kolok stands on the stone and
drills a hole. This will become the bottom of the piece, a pin will fit
into the hole. At last things are happening.